Volume
41, Number 4, November 2003
REGULAR
CONTRIBUTED PAPERS
MD.F.
Baki and R.G. Vickson
One-Operator, Two-Machine Open Shop and
Flow Shop Scheduling with Setup Times for
Machines and Maximum Lateness Objective
S.
Chamberland
On the Overlay Network Design Problem for
the Soft-Label Switch, Paths in IP Networks